CALCULATED SUBSTANTIATION OF THE TIME TAKEN TO FORCEDLY COOL DOWN WITH AIR THE CLN660-24.2/566/566 STEAM TURBINE OF THE TROITSK DISTRICT POWER PLANT 660 MW POWER UNIT СтатьяFedorov M.V., Radin Yu.A., Kontorovich T.S.Thermal Engineering. Том 72. 2025. С. 368-374
CARBON DIOXIDE ABSORPTION BY MICROALGAE: ANALYSIS OF TECHNOLOGIES AND ENERGY COSTS СтатьяKiseleva S.V., Chernova N.I., Vlaskin M.S., Grigorenko A.V., Chunzhuk E.A., Malaniy S.Ya., Bakumenko E.A., Rositskaya T.V.Thermal Engineering. Том 71. 2024. С. 1038-1048
CONCEPT OF A REGIONAL LIQUEFIED NATURAL GAS FUEL COMPLEX BASED ON A THERMAL POWER PLANT СтатьяPerov V.B., Fedorov M.V., Milman O.O., Zhedyaevsky D.N., Vivchar A.N., Ivanovsky A.A., Okhlopkov A.V., Nikishov K.S., Skazochkin A.V.Thermal Engineering. Том 71. 2024. С. 236-242